Water House Engineering

Road, Building, Bridges

  •  Triangular concrete V-Shape ditch and trapezium U-Shape ditch.
  • Stone work
  • Construction of pedestrian Track.
  • None covered gutters of dimension 70 x 70 and 50 x 50.
  • Small slabs with covering of sizes 70 and 50.
  • Precast curbs P2, T2, T3, CC2, CC3 and Boarder separation 50cm.
  • Prefabricated water drainage on slopes.
  • Installation of curbs P2, T2, T3, CC2, CC3 and boarder separation 50cm.
  • Laying of concrete ring of 800 and of 1000.
  • Construction of ring culvert head.
  • Construction of box culvert.
  • Construction of buildings.
  • Prefabrication of 800 and 1000 concrete rings
  • Fabrication of cobblestone
  • Construction of fence: GBA and DBA
  • Sliding Metallic Gates
  • Stone work for bridges and walls
  • Painting of buildings and related activities
  • Installation of vertical and horizontal road signs
  • Construction of highway fence of 2m high.
  • General electrification.
  • Construction of highway gutters
  • Displacement and installation of telecommunication networks.